Oak Bay infrastructure and capital projects cover a wide range of work, from physical buildings to roads and sewers. Find more details on current projects across the District of Oak Bay.
Oak Bay Infrastructure Projects
Project | Start | End (anticipated) | Work being done | Location | Follow |
---|---|---|---|---|---|
Florence Street Infrastructure | 12/2024 | 6/2025 |
| Florence Street: Haultain to Cadboro Bay Road. Jacks Lane | Details |
Uplands Sewer Separation (phase one) |
| Humber Catchment (phase one) | Details | ||
Estevan Utilities Project | 3/2025 |
| Estevan Ave: Willows Beach to Heron St. Lincoln Rd: Estevan to Burdick Ave. | Details |
Public Works Projects
Start | End (anticipated) | Location | Work being done | Traffic Impacts |
---|---|---|---|---|
3/21/2025 | McNeill at Foul Bay Road | Single-lane alternating traffic |
Water Main Flushing
Water main flushing cleans water distribution pipes and reservoirs of sediments that build up over time. Water main flushing provides the following system benefits:
- Improved water quality.
- Improved system hydraulic capacity.
- Improved system operation by identifying weak or problem areas.
- Improved/restored chlorine residual.
- Increased life of system components; including, pressure reducing valves, line valves, pumps, etc.
How does flushing affect me?
During the flushing process, you may experience low pressure and discoloured water. Any discolouration is temporary and is not a health hazard. If you experience discoloured water, please run the cold water tap in your bathtub or laundry tub to avoid clogging screens in faucets.
If you have any questions, contact Public Works at 250-598-4501